Commercial / Architectural
Project:
|
Mainway
Arena, |
|||||
Process / Service:
|
Interior
Structural Steel |
Maintenance or New Construction?
|
Maintainance
|
|||
|
City: |
|
Prov:
|
Ontario |
Country:
|
Canada |
|
|
Date
Applied: |
Aug. 2001 |
Temperature:
|
º F
|
º C
|
||
|
Coating
System: |
Amerlock
Sealer and Amerlock 2 |
|||||
|
Owner: |
City of
Burlington |
|||||
|
Contractor/Applicator: |
C.I.P.
Services |
|||||
|
Area(s)
Coated: |
Interior Structural
Steel |
|||||
|
Size
of Area Coated: |
|
|||||
Substrate: |
Carbon Steel (previously coated) |
||
|
Surface Prep: |
Hand Tool / Power Tool |
Other: |
Prep 88 |
|
Application |
Roller |
||